top of page

ON-GOING PROJECTS

[National Research Foundation of Korea] 

Development of Hyper-connected Hyper-intelligent Hybrid O&M System of Water Distribution Network

For 5 years (2020.3 ~ 2025.2) / PI

[National Research Foundation of Korea] 

Hyper-converged Forensic Research Center for Infrastructure

For 7 years (2021.6 ~ 2028.2​) / co-PI

[Korea Ministry of Environment] 

Development of technology for optimal flood response and effect analysis reflecting watershed characteristics

For 3 years and 9 months (2023.4 ~ 2026.12) / co-PI

[Korea Ministry of Environment] 

Improving Storage Capacity of Underground Infrastructure in Response to Urban Flooding and Developing Multi-functional Utilization Technology 

For 5 years (2024.4 ~ 2028.12) / co-PI

FINISHED PROJECTS

[Korea Ministry of Environment

Development of ANN Model for Optimal Reaction Material Selection in Selective Underground Diffusion Control Facility

For 6 months (2021.7 ~ 2022.12) / PI

[K-water]

Development of Integrated Detection Technique for Water Quality Abnormalities Based on Smart Data

For 1 year (2021.11 ~ 2022.11) / PI

[KISTI]

A Study on the Time Series Prediction Technique Based on IoT Sensor Data

For 1 year (2022.5 ~ 2022.10) / co-PI

[National Research Foundation of Korea]  

Management Modeling and Decision Optimization toward the Best Policies for Smart Water Management

For 3 months (2023.6 ~ 2023.8)

[KISTI] 

Utilization of Video and Image Data for Predicting Urban Flooding Risks

For 8 months (2023.4 ~ 2023.11) / PI

bottom of page